Data
4 weeks since the rollout are on file. Bring the file in below, or use a source that is already connected. Seat use is a weekly total. The metric you agreed is the result.
On file
Seat use, the agreed metric, and check-ins, by week. Totals only. A group under 5 is left out.
| Week | Outcomes | Seats used | Check-in |
|---|---|---|---|
| Aug 31 | 6 teams | — | — |
| Sep 7 | 6 teams | — | — |
| Sep 14 | 6 teams | — | — |
| Sep 21 | 6 teams | — | — |
| Sep 28 | 6 teams | — | — |
| Oct 5 | 6 teams | — | — |
| Oct 12 | 6 teams | — | — |
| Oct 19 | 6 teams | — | 77 of 124 |
| Oct 26 | 6 teams | 57 of 80 | 45 of 80 |
| Nov 2 | 6 teams | 58 of 80 | 47 of 80 |
| Nov 9 | 6 teams | 55 of 80 | 49 of 80 |
| Nov 16 | 6 teams | 55 of 80 | 45 of 80 |
| Nov 23 | — | — | Not sent |
Since the rollout
Upload the admin export or a CSV. Each source is optional. A week you upload replaces that week.
Use sample numbers instead
This stays off until the groups are confirmed.
Outcomes
period, team, metric, value, n. Uploading a week replaces that week.
Spend
period, amount, and optionally team and category (seat, token, other).
Agents
period, agent, team, spend, units, metric. An agent is measured on the same outcomes as a team, with its spend as its cost.
Connections
Manage in Settings0 of 18 connected. A connection records the source. Rows still arrive by upload until the admin grant is in place.
Admin usage
System of record
Billing
Tools already in use
Custom server
How this was calculated
The number is the first wave's change minus the held-back group's change over the same weeks. Each week counts equally. Inside a week, each team counts by the number of observations on that row. A row under the privacy floor is left out, and a week is left out when the included observations add up to less than the floor. The range is how much those weekly results bounced. It is not proof the tool caused the change.
The reading stays a description when the metric or the groups were changed after they were confirmed, when everyone got it at once, when the range still includes both no change and an improvement that would matter, or when the groups are too small to see that improvement. Groups under 5 are hidden before any of this runs.
The smallest change these groups can reliably detect is about 1.3 hours. You said 4.6 hours would matter, and this study can detect a change of that size.
The short check-in uses the same four questions every time. It does not enter the change.
The same calculation the workbook repeats. This window reads the study. It does not change it.
did = (postT - preT) - (postC - preC) se = sqrt(varPreT / nPreT + varPostT / nPostT + varPreC / nPreC + varPostC / nPostC) range = did ± tCrit(df) * se human = headcount * weeklyLoadedCost / weeklyVolumeBefore humanAi = (headcount * weeklyLoadedCost + toolSpend / postWeeks) / weeklyVolumeAfter agent = agentSpend / agentUnits
preT = 45.7 postT = 35.5 preC = 46 postC = 45.5 did = -9.7 range = -11.3 to -8.1
- Primary metric
- PR cycle time · lower is better
- Privacy floor
- 5 people. A row or a week under that floor is left out.
- Rows
- 288 kept, 0 dropped.
- Comparison
- First wave against the group held back.
- Teams left out
- None.
- Rules fired
- window_open
- Cost
- Pay, then pay plus tool spend, divided by weekly merged PR. Treatment only. People, before: $2,833 per merged PR. People plus the tool, after: $2,279 per merged PR.
- Return
- Not computed. The dollar stays blank until the company states how a movement becomes money.
- Software Engineer 15-1252.00 Software Developers · Write and edit application code, Review and debug code, Write tests
- Data Engineer 15-1243.00 Database Architects · Design tables, pipelines, and data models, Write transformation code, Check data quality
- Mobile Engineer 15-1252.00 Software Developers · Write and edit application code, Review and debug code, Write tests
- Security Engineer 15-1212.00 Information Security Analysts · Review alerts and false positives, Write security findings, Check configurations against a standard
- Site Reliability Engineer 15-1244.00 Network and Computer Systems Administrators · Respond to system alerts, Write and run operational scripts, Document incidents and runbooks
- Engineering Manager 11-3021.00 Computer and Information Systems Managers · Review status and unblock a team, Write a plan or a decision memo, Hire and coach
- QA Engineer 15-1253.00 Software Quality Assurance Analysts and Testers · Write and run test cases, Log and triage defects, Read requirements and spot gaps
- Developer Advocate 27-3031.00 Public Relations Specialists · Draft a post, a pitch, or a release, Adapt a technical change for a general reader, Brief an executive before a conversation
