Skip to content
Rollouts

Cursor for platform engineering

Meridian · Cursor

Week 5 of 10

Status

Platform, product, and data engineering are in the first wave. Mobile, security, and reliability are held back. Ten weeks were planned. This week is still being filed.

Live rollout

This week

Started October 26, 2026

PR cycle time is −9.7 hours so far. The planned weeks are not all on file.

The check-in has not gone out this week. 80 people are in the first wave.

  1. WaitingMonday's seat file has not arrived.
  2. Nov 16Week closed. Outcome file for 6 teams. 55 of 80 seats were used.
  3. Nov 9Week closed. Outcome file for 6 teams. 55 of 80 seats were used.
  4. Nov 2Week closed. Outcome file for 6 teams. 58 of 80 seats were used.
  5. Oct 26Week closed. Outcome file for 6 teams. 57 of 80 seats were used.
  6. Oct 19Baseline check-in closed. 77 of 124 people replied.
  7. Oct 12Groups locked. First wave and hold-back stay as agreed.
  8. Oct 5The metric was agreed. It stays the metric through the planned weeks.
  9. Oct 26Developer Advocate is 4 people, under 5, so that title stays out of the result.

Change

−9.7 hours

PR cycle time

Range

−11.3 to −8.1

So far. The planned window is still open.

People

124

80 first wave · 44 held back

Spend

$3,556

70% of seats used

PR cycle time

Closed weeks
Rollout Comparison
48.440.332.1Rollout Oct 26Aug 31Nov 16

Coverage

History8 weeks on file
Since launch4 closed of 10
First wave80 people
This week's check-in0 of 80
How this was calculated

The number is the first wave's change minus the held-back group's change over the same weeks. Each week counts equally. Inside a week, each team counts by the number of observations on that row. A row under the privacy floor is left out, and a week is left out when the included observations add up to less than the floor. The range is how much those weekly results bounced. It is not proof the tool caused the change.

The reading stays a description when the metric or the groups were changed after they were confirmed, when everyone got it at once, when the range still includes both no change and an improvement that would matter, or when the groups are too small to see that improvement. Groups under 5 are hidden before any of this runs.

The smallest change these groups can reliably detect is about 1.3 hours. You said 4.6 hours would matter, and this study can detect a change of that size.

The short check-in uses the same four questions every time. It does not enter the change.

Employee notice

The same calculation the workbook repeats. This window reads the study. It does not change it.

did = (postT - preT) - (postC - preC)
se = sqrt(varPreT / nPreT + varPostT / nPostT + varPreC / nPreC + varPostC / nPostC)
range = did ± tCrit(df) * se
human = headcount * weeklyLoadedCost / weeklyVolumeBefore
humanAi = (headcount * weeklyLoadedCost + toolSpend / postWeeks) / weeklyVolumeAfter
agent = agentSpend / agentUnits
preT = 45.7
postT = 35.5
preC = 46
postC = 45.5
did = -9.7
range = -11.3 to -8.1
Primary metric
PR cycle time · lower is better
Privacy floor
5 people. A row or a week under that floor is left out.
Rows
288 kept, 0 dropped.
Comparison
First wave against the group held back.
Teams left out
None.
Rules fired
window_open
Cost
Pay, then pay plus tool spend, divided by weekly merged PR. Treatment only. People, before: $2,833 per merged PR. People plus the tool, after: $2,279 per merged PR.
Return
Not computed. The dollar stays blank until the company states how a movement becomes money.
  • Software Engineer 15-1252.00 Software Developers · Write and edit application code, Review and debug code, Write tests
  • Data Engineer 15-1243.00 Database Architects · Design tables, pipelines, and data models, Write transformation code, Check data quality
  • Mobile Engineer 15-1252.00 Software Developers · Write and edit application code, Review and debug code, Write tests
  • Security Engineer 15-1212.00 Information Security Analysts · Review alerts and false positives, Write security findings, Check configurations against a standard
  • Site Reliability Engineer 15-1244.00 Network and Computer Systems Administrators · Respond to system alerts, Write and run operational scripts, Document incidents and runbooks
  • Engineering Manager 11-3021.00 Computer and Information Systems Managers · Review status and unblock a team, Write a plan or a decision memo, Hire and coach
  • QA Engineer 15-1253.00 Software Quality Assurance Analysts and Testers · Write and run test cases, Log and triage defects, Read requirements and spot gaps
  • Developer Advocate 27-3031.00 Public Relations Specialists · Draft a post, a pitch, or a release, Adapt a technical change for a general reader, Brief an executive before a conversation