Skip to content
Rollouts

Cursor for platform engineering

Meridian · Cursor

Week 5 of 10

History

8 weeks from before 2026-10-26 are on file. Four weeks is the minimum before you confirm who gets it first.

Weeks before the rollout

Upload a CSV from the system you already use. Columns: period, team, metric, value, n. An engineering export with pr_cycle_time_hours works too.

Example file
Use sample numbers instead

Short check-in

Four questions, same wording every time. Sending from here records sample answers. It does not email anyone yet.

Baseline via email: 77 of 124 responses

Employee notice

Send this before the first pulse. People should know what is collected and that they will not be reported on individually.

Open the noticeNotice planned
How this was calculated

The number is the first wave's change minus the held-back group's change over the same weeks. Each week counts equally. Inside a week, each team counts by the number of observations on that row. A row under the privacy floor is left out, and a week is left out when the included observations add up to less than the floor. The range is how much those weekly results bounced. It is not proof the tool caused the change.

The reading stays a description when the metric or the groups were changed after they were confirmed, when everyone got it at once, when the range still includes both no change and an improvement that would matter, or when the groups are too small to see that improvement. Groups under 5 are hidden before any of this runs.

The smallest change these groups can reliably detect is about 1.3 hours. You said 4.6 hours would matter, and this study can detect a change of that size.

The short check-in uses the same four questions every time. It does not enter the change.

Employee notice

The same calculation the workbook repeats. This window reads the study. It does not change it.

did = (postT - preT) - (postC - preC)
se = sqrt(varPreT / nPreT + varPostT / nPostT + varPreC / nPreC + varPostC / nPostC)
range = did ± tCrit(df) * se
human = headcount * weeklyLoadedCost / weeklyVolumeBefore
humanAi = (headcount * weeklyLoadedCost + toolSpend / postWeeks) / weeklyVolumeAfter
agent = agentSpend / agentUnits
preT = 45.7
postT = 35.5
preC = 46
postC = 45.5
did = -9.7
range = -11.3 to -8.1
Primary metric
PR cycle time · lower is better
Privacy floor
5 people. A row or a week under that floor is left out.
Rows
288 kept, 0 dropped.
Comparison
First wave against the group held back.
Teams left out
None.
Rules fired
window_open
Cost
Pay, then pay plus tool spend, divided by weekly merged PR. Treatment only. People, before: $2,833 per merged PR. People plus the tool, after: $2,279 per merged PR.
Return
Not computed. The dollar stays blank until the company states how a movement becomes money.
  • Software Engineer 15-1252.00 Software Developers · Write and edit application code, Review and debug code, Write tests
  • Data Engineer 15-1243.00 Database Architects · Design tables, pipelines, and data models, Write transformation code, Check data quality
  • Mobile Engineer 15-1252.00 Software Developers · Write and edit application code, Review and debug code, Write tests
  • Security Engineer 15-1212.00 Information Security Analysts · Review alerts and false positives, Write security findings, Check configurations against a standard
  • Site Reliability Engineer 15-1244.00 Network and Computer Systems Administrators · Respond to system alerts, Write and run operational scripts, Document incidents and runbooks
  • Engineering Manager 11-3021.00 Computer and Information Systems Managers · Review status and unblock a team, Write a plan or a decision memo, Hire and coach
  • QA Engineer 15-1253.00 Software Quality Assurance Analysts and Testers · Write and run test cases, Log and triage defects, Read requirements and spot gaps
  • Developer Advocate 27-3031.00 Public Relations Specialists · Draft a post, a pitch, or a release, Adapt a technical change for a general reader, Brief an executive before a conversation