History
8 weeks from before 2026-08-17 are on file. Four weeks is the minimum before you confirm who gets it first.
Weeks before the rollout
Upload a CSV from the system you already use. Columns: period, team, metric, value, n. An engineering export with pr_cycle_time_hours works too.
Use sample numbers instead
Short check-in
Four questions, same wording every time. Sending from here records sample answers. It does not email anyone yet.
Baseline via email: 10 of 30 responses
Follow-up via email: 10 of 30 responses
Employee notice
Send this before the first pulse. People should know what is collected and that they will not be reported on individually.
How this was calculated
The number is the first wave's change minus the held-back group's change over the same weeks. Each week counts equally. Inside a week, each team counts by the number of observations on that row. A row under the privacy floor is left out, and a week is left out when the included observations add up to less than the floor. The range is how much those weekly results bounced. It is not proof the tool caused the change.
The reading stays a description when the metric or the groups were changed after they were confirmed, when everyone got it at once, when the range still includes both no change and an improvement that would matter, or when the groups are too small to see that improvement. Groups under 5 are hidden before any of this runs.
The smallest change these groups can reliably detect is about 13.1 days. You said 4.8 days would matter, and this study is unlikely to see a change that small. A flat result would be ambiguous.
The short check-in uses the same four questions every time. It does not enter the change.
The same calculation the workbook repeats. This window reads the study. It does not change it.
did = (postT - preT) - (postC - preC) se = sqrt(varPreT / nPreT + varPostT / nPostT + varPreC / nPreC + varPostC / nPostC) range = did ± tCrit(df) * se human = headcount * weeklyLoadedCost / weeklyVolumeBefore humanAi = (headcount * weeklyLoadedCost + toolSpend / postWeeks) / weeklyVolumeAfter agent = agentSpend / agentUnits
preT = 48.2 postT = 48.5 preC = 50.3 postC = 49.3 did = 1.3 range = -5.2 to 7.8
- Primary metric
- Time to fill · lower is better
- Privacy floor
- 5 people. A row or a week under that floor is left out.
- Rows
- 288 kept, 0 dropped.
- Comparison
- First wave against the group held back.
- Teams left out
- None.
- Rules fired
- underpowered
- Cost
- Pay, then pay plus tool spend, divided by weekly requisition filled. Treatment only. People, before: $7,329 per requisition filled. People plus the tool, after: $6,872 per requisition filled.
- Return
- Not computed. The dollar stays blank until the company states how a movement becomes money.
- Recruiter 13-1071.00 Human Resources Specialists · Screen applications against a role, Write job posts and candidate messages, Answer routine policy questions
- Compensation Specialist 13-1141.00 Compensation, Benefits, and Job Analysis Specialists · Benchmark a role against market data, Draft offer and pay-range language, Answer routine benefits questions
- People Operations 13-1071.00 Human Resources Specialists · Screen applications against a role, Write job posts and candidate messages, Answer routine policy questions
- Training Specialist 13-1151.00 Training and Development Specialists · Draft training materials, Adapt a course to a team, Deliver a session
