These are sample numbers. Replace them with an admin export or CSV.
PR cycle time
Narrow range| Metric | Change | 95% range | Read |
|---|---|---|---|
| PR cycle timePrimary | −9.6 hours | −10.8 to −8.3 hours | Agreed direction |
Change in the rollout group minus change in the comparison group. Each week counts equally. Inside a week, each team counts by the number of observations on that row. The range is a 95% interval from week-to-week variation.
The other metrics
The agreed metric is the one in the reading above. These are the other metrics on file.
| Metric | Change | 95% range | Read |
|---|---|---|---|
| PRs merged | +0.26 PRs per person per week | +0.21 to +0.32 PRs per person per week | Agreed direction |
| Change failure rate | −0.1 pp | −0.5 pp to +0.3 pp | Range includes no change |
| Time to first review | −3.3 hours | −3.9 to −2.7 hours | Agreed direction |
What it cost
Loaded pay is an assumption you can edit: $4,500 per person per week. Cost per merged PR uses the rollout group's before and after. It is not adjusted by the comparison group. The agent's own cost, when shown, leaves human pay out and is not comparable to the other rows.
Seat spend
$7,200
Token and API spend
$1,690
Agent spend
$0.00
Other spend
$0.00
$8,890 in this window
In a typical measurement week, 71% of the 80 seats in the rollout group were used.
| Way of working | Cost | What is in the number |
|---|---|---|
| People, before | $2,800 per merged PR | Loaded pay in the rollout group, divided by weekly volume before the rollout. |
| People plus the tool, after | $2,336 per merged PR | Loaded pay plus seat, token, and other tool spend, divided by weekly volume after. |
Adoption
Who used it, at the team. This explains the rollout. It is not a second result. Teams that use a tool more may already have been different.
75% of job titles were recognized without an edit.
| Segment | People | Sessions / person | Breadth | Outcome change |
|---|---|---|---|---|
| Light | 27 | 2.10 | 22% | −1.5 |
| Selective | 31 | 7.50 | 48% | −4 |
| Embedded | 16 | 14.00 | 74% | −10 |
| Question | Group | Baseline | Follow-up | n |
|---|---|---|---|---|
| Quality | Rollout | 3.45 | 3.70 | 51 |
| Quality | Comparison | 3.45 | 3.45 | 28 |
| Effectiveness | Rollout | 3.45 | 3.70 | 51 |
| Effectiveness | Comparison | 3.45 | 3.45 | 28 |
| Cognitive load | Rollout | 3.50 | 3.20 | 51 |
| Cognitive load | Comparison | 3.50 | 3.50 | 28 |
| Autonomy | Rollout | 3.45 | 3.70 | 51 |
| Autonomy | Comparison | 3.45 | 3.45 | 28 |
Baseline response 64% of 124 people invited. At or above the 40% mark.
Reading
The primary metric moved in the agreed direction. The 95% range does not include zero. The comparison group has not received it.
Same numbers for everyone in the room. People look at adoption. Finance looks at cost. Operations looks at whether the work moved.
Hidden because the group was too small
- Developer Advocate is hidden. Groups under 5 are not reported.
Who was in it
| Team | Group | People |
|---|---|---|
| Platform | First wave | 36 |
| Product | First wave | 28 |
| Data | First wave | 16 |
| Mobile | Hold back | 18 |
| Security | Hold back | 12 |
| Reliability | Hold back | 14 |
The workbook repeats this from the stored rows. On the Estimate sheet, column B is an Excel formula and column C is the number this report published. They should match.
How this was calculated
The number is the first wave's change minus the held-back group's change over the same weeks. Each week counts equally. Inside a week, each team counts by the number of observations on that row. A row under the privacy floor is left out, and a week is left out when the included observations add up to less than the floor. The range is how much those weekly results bounced. It is not proof the tool caused the change.
The reading stays a description when the metric or the groups were changed after they were confirmed, when everyone got it at once, when the range still includes both no change and an improvement that would matter, or when the groups are too small to see that improvement. Groups under 5 are hidden before any of this runs.
The smallest change these groups can reliably detect is about 1.7 hours. You said 4.6 hours would matter, and this study can detect a change of that size.
The short check-in uses the same four questions every time. It does not enter the change.
The same calculation the workbook repeats. This window reads the study. It does not change it.
did = (postT - preT) - (postC - preC) se = sqrt(varPreT / nPreT + varPostT / nPostT + varPreC / nPreC + varPostC / nPostC) range = did ± tCrit(df) * se human = headcount * weeklyLoadedCost / weeklyVolumeBefore humanAi = (headcount * weeklyLoadedCost + toolSpend / postWeeks) / weeklyVolumeAfter agent = agentSpend / agentUnits
preT = 46 postT = 35.8 preC = 45.7 postC = 45 did = -9.6 range = -10.8 to -8.3
- Primary metric
- PR cycle time · lower is better
- Privacy floor
- 5 people. A row or a week under that floor is left out.
- Rows
- 432 kept, 0 dropped.
- Comparison
- First wave against the group held back.
- Teams left out
- None.
- Rules fired
- favorable_expand
- Cost
- Pay, then pay plus tool spend, divided by weekly merged PR. Treatment only. People, before: $2,800 per merged PR. People plus the tool, after: $2,336 per merged PR.
- Return
- Not computed. The dollar stays blank until the company states how a movement becomes money.
- Software Engineer 15-1252.00 Software Developers · Write and edit application code, Review and debug code, Write tests
- Data Engineer 15-1243.00 Database Architects · Design tables, pipelines, and data models, Write transformation code, Check data quality
- Mobile Engineer 15-1252.00 Software Developers · Write and edit application code, Review and debug code, Write tests
- Security Engineer 15-1212.00 Information Security Analysts · Review alerts and false positives, Write security findings, Check configurations against a standard
- Site Reliability Engineer 15-1244.00 Network and Computer Systems Administrators · Respond to system alerts, Write and run operational scripts, Document incidents and runbooks
- Engineering Manager 11-3021.00 Computer and Information Systems Managers · Review status and unblock a team, Write a plan or a decision memo, Hire and coach
- QA Engineer 15-1253.00 Software Quality Assurance Analysts and Testers · Write and run test cases, Log and triage defects, Read requirements and spot gaps
- Developer Advocate 27-3031.00 Public Relations Specialists · Draft a post, a pitch, or a release, Adapt a technical change for a general reader, Brief an executive before a conversation
